Construction materials left behind - List of Manufacturers, Suppliers, Companies and Products

Construction materials left behind Product List

1~1 item / All 1 items

Displayed results

Underground obstacle removal work

Construction that meets on-site conditions is possible! Actively developing plans and designs for the construction of retaining walls and support structures!

The "Underground Obstacle Removal Work" involves the removal of existing underground structures and retaining piles. Our company utilizes foundation machinery such as "BG excavators," "full rotation excavators," and "rock augers" to enable construction that meets various site conditions as much as possible. By incorporating the accumulated know-how from various retaining wall construction projects, we actively develop planning, design, construction, and material provision for the construction of retaining walls and support structures. Additionally, we employ the "SMW Method," which involves drilling, injecting, and mixing in-situ soil with cement and bentonite slurry, and inserting H-shaped steel as a stress material to create a continuous columnar wall. 【Features of Underground Obstacle Removal Work】 ■ Construction that meets site conditions as much as possible ■ Incorporation of accumulated know-how from various retaining wall projects ■ Active development of planning, design, construction, and material provision for the construction of retaining walls and support structures *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering works
  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration